Header: Beaver Dam Road Closure
The MBTA will be doing track work on the Beaver Dam grade crossing Friday October 17, 2014 from 10:00pm until Saturday October 18, 2014 at 4:00pm.
Please see attached detour plan (show link to traffic plan)
Beaver Dam Road Detour Plan is posted on the website.
Shutdown roadway on October 17th at 10:00pm
Open roadway on October 18th at 4:00pm
Provided there are no major issues.